KitchenAid KGCD807XBL Instruction Manual Page 10

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 9
10
6. Place cooktop right side up into the cutout.
NOTE: Make sure that the front edge of the cooktop is
parallel to the front edge of the countertop. If repositioning is
needed, lift entire cooktop up from the cutout to avoid
scratching the countertop.
7. Connect blower exhaust scroll to ducting.
8. Use vent clamps to secure the ducting to the blower exhaust
scroll.
9. Reinstall grease filter.
10. Reinstall vent grille.
Rotate Blower - Optional
IMPORTANT: The following additional steps must be performed
if the product is being installed in peninsula or island cabinetry.
The blower exhaust scroll is shipped from the factory set to
exhaust straight out the back of the cabinet through an exterior
wall.
To rotate blower:
1. Remove the right and left grates. Then remove the vent grille.
See illustration in Step 4 of the “Install Cooktop” section.
2. Locate the 4 locknuts inside the plenum.
3. Use ³⁄₈" socket and ratchet handle to loosen the nut half of a
rotation. Repeat this process for each of the 4 nuts.
4. With the nuts loosened, the blower exhaust scroll can be
easily rotated downward.
5. Retighten each nut with the ³⁄₈" socket, extension and ratchet.
Make Gas Connection
1. Apply pipe-joint compound made for use with Natural and LP
gas to the smaller thread ends of the flexible connector
adapters (see C and G in the following illustration).
2. Attach one adapter to the gas pressure regulator and the
other adapter to the gas shutoff valve. Tighten both adapters.
3. Use a ¹⁵⁄₁₆" combination wrench and channel lock pliers to
attach the flexible connector to the adapters. Check that
connector is not kinked.
A. Blower exhaust scroll
B. Plenum
C. Blower motor
D. #10-32 locknuts (4)
E. Motor mounting plate
A. #10 - 32 locknut
B. Plenum
C. Flat washer
D. Blower guard
D
C
A
D
E
B
A
C
D
B
WARNING
Explosion Hazard
Use a new CSA International approved gas supply line.
Install a shut-off valve.
Securely tighten all gas connections.
If connected to LP, have a qualified person make sure
gas pressure does not exceed 14" (36 cm) water
column.
Examples of a qualified person include:
licensed heating personnel,
authorized gas company personnel, and
authorized service personnel.
Failure to do so can result in death, explosion, or fire.
Page view 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 23 24

Comments to this Manuals

No comments